MM Engineering were recently contacted by Sebden Steel to resolve their historic flooding issues. Sebden are a steel stockist/wholesaler and were having surface water flooding issues to the rear fire exit points of their distribution warehouse. Surface water flooding occurred back in the summer of 2015 and lead to a significant insurance flood claim due to loss of stock and business interruption.

We designed, manufactured and installed our engineered flood doors to prevent future events from re-occurring. The project duration was approximately 6 weeks from order to installation and completion. For more information on our flood doors check out our flood door page https://www.mmengineering.co.uk/flood-doors

Reference from the client;

 

    We engaged M M Engineering to carry out a small flood protection door project for two critical fire exits in our Midlands facility. From initial enquiry stage through detail specification and final design, we found M M Engineering a real pleasure to do business with. Once we agreed price and delivery, the actual production process was seamless, all our requests for H&S data and method statements etc, were expertly dealt with in a very timely manner. The doors were expertly fitted on time by two very professional installation engineers who followed all HS instruction and cleaned any tidied up after completion of installation. Great job guys!

Paul Bailey

Group Operations Director

Sebden Steel